沙湾水电站以库代池运行方案可行性研究
引用本文:张璠,王苏荣. 沙湾水电站以库代池运行方案可行性研究[J]. 中国水运, 2006, 6(9): 108-110
作者姓名:张璠  王苏荣
作者单位:重庆交通大学研究生学院,青海省水路运输管理局
摘    要:沙湾水电站运用了以水库代替沉沙池的方案,通过调度水库运行方案,达到控制水库泥沙冲淤平衡的目的,从而保证设计所需长期有效的日调节库容。

关 键 词:库容  冲沙  淤积  含沙量  以库代池
文章编号:1006-7973(2006)09-0108-03
修稿时间:2006-08-12

The Shawan hydroelectric power station opens by the storehouse generation of pond movement plan
Zhang Fan,Wang Surong. The Shawan hydroelectric power station opens by the storehouse generation of pond movement plan[J]. China Water Transport, 2006, 6(9): 108-110
Authors:Zhang Fan  Wang Surong
Affiliation:Zhang Fan Wang Surong
Abstract:The Shawan hydroelectric power station utilized has replaced the settling basin by the reservoir the plan, through dispatched the reservoir movement plan, achieved controlled the reservoir silting to flush the silt balance the goal, thus the guarantee design needed the long-term effective date adjustment storage capacity.
Keywords:Storage capacity Flushes the sand Siltation Silt content By storehouse generation of pond  