首页 | 本学科首页   官方微博 | 高级检索  
     

特大桥梁供配电施工时序探讨
引用本文:谢光秋. 特大桥梁供配电施工时序探讨[J]. 城市道桥与防洪, 2010, 0(1): 105-108
作者姓名:谢光秋
作者单位:广州珠江黄埔大桥建设有限公司,广东广州,511434
摘    要:该文分析了特大桥梁供配电工程供电和配电的特点,结合黄埔大桥工程的实施案例,详细阐述了中压电能传输系统施工时序合理安排对特大桥梁供配电工程的重要性。实践证明,供配电工程施工时序的合理调配,是特大桥梁工程施工质量、进度、造价控制的一个重要环节。

关 键 词:特大桥梁  供配电  中压电能传输  施工时序  探讨

Discussion on Construction Sequence of Power Supply and Distribution for Overlarge Bridge
Xie Guangqiu. Discussion on Construction Sequence of Power Supply and Distribution for Overlarge Bridge[J]. Urban Roads Bridges & Flood Control, 2010, 0(1): 105-108
Authors:Xie Guangqiu
Abstract:The article analyzes the characteristics of the power supply and distribution for the overlarge bridge project. Combined with the case of Huangpu Bridge Project, the article sets forth in detail the significance of reasonably arranging the construction sequence of power supply and distribution for the overlarge bridges in the implementation of the middle-voltage electrical energy transmission system. The practice proves that the reasonable rearrangement of construction sequence of power supply and distribut...
Keywords:overlarge bridge  power supply and distribution  middle-voltage electrical energy transmission  construction sequence  discussion  
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号