大跨径钢管拱两段法吊装方案研究
引用本文:孙九春,陆永兴. 大跨径钢管拱两段法吊装方案研究[J]. 公路, 2006, 0(12): 42-45
作者姓名:孙九春  陆永兴
作者单位:腾达建设集团股份有限公司,上海市,200122
摘    要:针对现场实际情况本文提出了大跨径钢管拱分两段浮吊吊装的方法、拱肋合龙方案和有限元模型简化方法,通过计算分析确定了合龙过程中的相关技术参数和拱肋力学状态。

关 键 词:钢管拱  合龙  有限元  吊装
文章编号:0451-0712(2006)12-0042-04
收稿时间:2006-04-11
修稿时间:2006-04-11

A Study on Two Segments Lifting Scheme of Long Span Concrete-Filled Steel Tube Arch
SUN Jiu-chun,LU Yong-xing. A Study on Two Segments Lifting Scheme of Long Span Concrete-Filled Steel Tube Arch[J]. Highway, 2006, 0(12): 42-45
Authors:SUN Jiu-chun  LU Yong-xing
Affiliation:Tengda Construction Group Co, ,Ltd,Shanghai 200122 ,China
Abstract:To counter the site situation a two segments lifting scheme by floating crane and a closure scheme of the arch rib and a simplified method for the finite element model are put forward in the paper.The relative technique parameters and the arch rib mechanics state during the closure are determined through calculation analysis.
Keywords:concrete-filled steel tube arch  closure  finite element  lifting  