首页 | 本学科首页   官方微博 | 高级检索  
     

高速公路隧道路段大型车运行速度模型
引用本文:方靖, 汪双杰, 祝站东, 周荣贵. 高速公路隧道路段大型车运行速度模型[J]. 交通运输工程学报, 2010, 10(3): 90-94. doi: 10.19818/j.cnki.1671-1637.2010.03.016
作者姓名:方靖  汪双杰  祝站东  周荣贵
作者单位:1.交通运输部公路科学研究院, 北京 100088;;2.中交第一公路勘察设计研究院有限公司, 陕西 西安 710075;;3.北京工业大学 交通工程北京市重点实验室, 北京 100124
基金项目:国家西部交通建设科技项目2007 318 223 25 国家西部交通建设科技项目2007 318 490 26
摘    要:为确定高速公路隧道路段大型车的运行速度特征点和运行速度值, 分析了高速公路隧道路段运行速度特性及规律, 通过跟车试验, 研究了不同长度隧道内驾驶人的行车规律和隧道路段的车速变化规律, 提出了隧道路段运行速度研究点, 通过特征点速度采集试验, 确定了隧道路段运行速度特征点, 建立了高速公路长大隧道特征点运行速度模型, 并对模型进行了验证。分析结果表明: 中短隧道对大型车运行速度影响不大; 隧道进口前200 m、进口、出口外100 m 3个点可作为长大隧道运行速度特征点; 运行速度模型的相对误差均在10%以内, 模型有效。

关 键 词:运行速度   隧道路段   回归分析   设计一致性   安全性评价
收稿时间:2010-01-18

Operating speed models for trucks at expressway tunnel sections
FANG Jing, WANG Shuang-jie, ZHU Zhan-dong, ZHOU Rong-gui. Operating speed models for trucks at expressway tunnel sections[J]. Journal of Traffic and Transportation Engineering, 2010, 10(3): 90-94. doi: 10.19818/j.cnki.1671-1637.2010.03.016
Authors:FANG Jing  WANG Shuang-jie  ZHU Zhan-dong  ZHOU Rong-gui
Affiliation:1. Research Institute of Highway of Ministry of Transport, Beijing 100088, China;;2. CCCC First Highway Consultants Co., Ltd., Xi'an 710075, Shaanxi, China;;3. Key Lab of Transportation Engineering of Beijing, Beijing University of Technology, Beijing 100124, China
Abstract:In order to identify the characteristic points and operating speeds for trucks at expressway tunnel sections, the operating speed characteristics at tunnel sections were analyzed.According to car following tests, the driving behaviors and speed changes of trucks in varied length tunnels were studied, and the observation points at tunnel sections were identified.After speed observation, the characteristic points at tunnel sections were verified, the operating speed models for the characteristic points were achieved, and the validities of the models were verified.Analysis result shows that middle tunnel and short tunnel have little impacts on truck speed.200 m before tunnel entrance, entrance point and 100 m after exit are determined as three characteristic points of operating speed for long tunnel, the relative errors of the models are within 10%, so the models are valid.
Keywords:operating speed  tunnel section  regression analysis  design consistency  safety audit
本文献已被 CNKI 等数据库收录!
点击此处可从《交通运输工程学报》浏览原始摘要信息
点击此处可从《交通运输工程学报》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号