省界隧道岩溶综合治理措施
引用本文:王先聪.省界隧道岩溶综合治理措施[J].水运科技信息,2010(5):31-33.
作者姓名:王先聪
作者单位:贵州省交通规划勘察设计研究院,贵阳550001
摘    要:省界隧道在施工期间遇到大型岩溶充填物,隧道拱顶及左侧全为岩溶充填物。岩溶段长度约30m,埋深约100m,在隧道开挖过程中,时逢降雨,岩溶充填物在地表水的作用下下滑,使初期支护严重超载,致使隧道发生坍塌。文中介绍了隧道的病害情况,并提出了综合治理措施。

关 键 词:岩溶  隧道  综合治理

Comprehensive Countermeasures of Karst in Shengjie Tunnel
Wang Xiancong.Comprehensive Countermeasures of Karst in Shengjie Tunnel[J].Transportation Science & Technology,2010(5):31-33.
Authors:Wang Xiancong
Institution:Wang Xiancong (Guizhou Communication Planning and Surveying Design Institute,Guiyang 550001,China)
Abstract:There were some large karst fillings in Shengjie Tunnel during the construction.The apex of arch and the left side of the tunnel was filled with karst fillings.The karst fillings were about 30m long and the depth of embedment was about 100m.At the beginning of excavating,it was confronted with raining.Under the influence of the surface water,the karst fillings made the preliminary bracing overload and made the tunnel collapse.The paper introduced the tunnel condition in detail and proposed the comprehensive countermeasures.The practice proved the comprehensive countermeasures are reasonable and safe.
Keywords:karst  tunnel  comprehensive countermeasure