首页 | 本学科首页   官方微博 | 高级检索  
     检索      

直线电机列车作用下高架桥的动力响应分析
引用本文:郭薇薇,夏禾.直线电机列车作用下高架桥的动力响应分析[J].中国铁道科学,2007,28(4):55-60.
作者姓名:郭薇薇  夏禾
作者单位:北京交通大学土木建筑工程学院,北京100044
摘    要:建立直线感应电机(LIM)运载系统中列车与高架桥梁的动力相互作用空间分析模型,它由车辆模型和有限元桥梁模型组成。对具有2个转向架的4轴LIM列车车辆建立27个自由度的车辆动力模型。通过对有限元桥梁模型采用模态综合技术,以轨道不平顺作为系统的激励源,建立LIM列车和高架桥梁的耦合运动方程组,并编制计算分析程序。以一座3跨30 m简支梁高架桥为例,模拟LIM列车上桥、出桥的全过程,计算分析高架桥梁的自振特性及其在LIM列车通过时的动力响应特点。研究表明:由LIM列车引起的桥梁横、竖向位移响应值较小,远小于铁路规范的容许值;桥梁的竖向挠度主要受列车的重力荷载控制;桥梁最大横向位移响应出现在墩顶处,随着墩高和车速的增大而增大。

关 键 词:直线感应电机  列车  高架桥  相互作用  动力响应
文章编号:1001-4632(2007)04-0055-06
收稿时间:2006-06-14
修稿时间:2006-06-142007-04-28

Dynamic Response Analysis of Elevated Bridge under Linear Induction Motor Train
GUO Weiwei,XIA He.Dynamic Response Analysis of Elevated Bridge under Linear Induction Motor Train[J].China Railway Science,2007,28(4):55-60.
Authors:GUO Weiwei  XIA He
Institution:School of Civil Engineering and Architecture, Beijing Jiaotong University, Beijing 100044, China
Abstract:A three-dimensional dynamic interaction model of the linear induction motor(LIM) systems with the elevated bridge is established,which is composed of the linear-motor-driven train model and the finite element bridge model.Each 2-bogie 4-axle vehicle in a LIM train is modeled by a 27-degrees-of-freedom dynamic system.By applying a modal superposition technique to the bridge only and using the measured track irregularities samples as the self-excitations of the train-bridge system,the equations of motion are established and a computer code for analyzing the dynamic responses of the elevated bridge and the LIM train is developed.The proposed framework is then applied to a real 3-span elevated bridge with 30 m simple-supported girders.The whole histories of the LIM train passing through the bridge are simulated on computer.The natural frequencies and mode shapes of the bridge are analyzed.The dynamic responses of the elevated bridge under the running LIM train are computed.The numerical results show that the lateral and vertical displacement responses of the bridge induced by the LIM train are quite smaller than the allowable values.The deflections of the bridge are mainly controlled by train's gravity loading.The maximum lateral displacements of the bridge occur at the top of piers and increase with the height of piers and train speed.
Keywords:Linear induction motor  Train  Elevated bridge  Interaction  Dynamic response
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号