首页 | 本学科首页   官方微博 | 高级检索  
     

北京铁路地下直径线盾构选型
引用本文:张双亚. 北京铁路地下直径线盾构选型[J]. 隧道建设, 2007, 27(2): 21-23,46
作者姓名:张双亚
作者单位:中铁隧道集团有限公司,河南,洛阳,471009
摘    要:针对不同类型盾构的结构特点,进行了可行性分析和论证;通过对盾构类型与地层渗透性的关系、与黏土含量的关系、与颗粒级配的关系的分析,从开挖面稳定机理、地表沉降、装机功率、刀具磨损、施工成本、施工进度等方面对盾构选型进行了详细阐述和方案比较,并对盾构施工的关键技术进行了探讨。

关 键 词:盾构选型渗透系数开挖面稳定地表沉降
收稿时间:2006-11-16
修稿时间:2006-11-162007-03-07

Type Selection of Shield Machines for Beijing Rail Underground Transit Line
ZHANG Shuang-ya. Type Selection of Shield Machines for Beijing Rail Underground Transit Line[J]. Tunnel Construction, 2007, 27(2): 21-23,46
Authors:ZHANG Shuang-ya
Affiliation:China Railway Tunnel Group Co. , Ltd. ,Luoyang 471009, Henan, China
Abstract:In the paper, feasibility analysis and expatiations are made on basis of the structural features of different types of shield machines. On basis of analysis on the relations between the shield machine types and the ground permeability coefficient, clay content and grain size grading , detailed expatiations and comparisons are made on the type selection of shield machines in respect of working face stability mechanisms, ground settlement, installation power, cutter wearing, construction cost and construction progress. Furthermore, discussions are made on the key construction technologies of shield machines.
Keywords:shield machine   type selection   permeability coefficient   face stability   surface settlement
本文献已被 维普 万方数据 等数据库收录!
点击此处可从《隧道建设》浏览原始摘要信息
点击此处可从《隧道建设》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号