空心板及T梁预制场的综合建设方案
引用本文:殷南东,刘宇飞.空心板及T梁预制场的综合建设方案[J].北方交通,2011(12):33-35.
作者姓名:殷南东  刘宇飞
作者单位:湖南通泰工程有限公司,长沙,410004
摘    要:上构梁板的预制是制约桥梁施工进度的关键,通过梁板预制场综合设计方案的比选确定的建设方案,保证了在降低施工成本的前提下梁板预制的进度,保证了桥梁施工的总体工期。

关 键 词:空心板  预制场  T梁  施工成本  工期

Comprehensive Construction Scheme for Precast Yard of Hollow Slab and T-shaped Beam
Abstract:The precasting of beam and slab for upper structure is the key of influencing bridge construction progress.Construction scheme determined through comparision and selection of comprehensive design scheme for precast yard of beam and slab could ensure the precasting schedule of beam and slab with the premise of reducing construction cost,so that the overall construction period for bridge is guaranteed.
Keywords:Hollow slab  Precast yard  T-shaped beam  Construction cost  Construction period  