首页 | 本学科首页   官方微博 | 高级检索  
     检索      

长大明挖隧道回填土堆载预压研究
引用本文:于进江,王久军,岳岭,凌云鹏.长大明挖隧道回填土堆载预压研究[J].铁道勘察,2020(1):49-53,59.
作者姓名:于进江  王久军  岳岭  凌云鹏
作者单位:京张城际铁路有限公司;中铁工程设计咨询集团有限公司
基金项目:中国铁路总公司科技研究开发计划重大课题(2014G004-C)
摘    要:堆载预压是处理软弱地基的一种有效方法,可以加快软弱地基的固结沉降。为了研究在明洞回填土地段采用堆载预压加快固结沉降的可行性,以京张高铁东花园隧道为工程背景,通过有限元软件对结构覆土进行验算,得出不同衬砌类型明洞所能承受的最大覆土厚度,利用改进高木俊介法对明洞回填土堆载预压进行计算,得出不同堆载高度下回填土的固结度。研究结果表明:(1)在堆载条件下,回填土的固结度随着覆土厚度的增大而呈幂函数形式减小,且固结度受堆载高度的影响不大。(2)在相同的覆土条件下,堆载高度对保留土高度影响较小;(3)堆载预压可以加快明洞回填土的固结沉降,是一个比较可行的方案。

关 键 词:明洞  回填土  堆载预压  改进高木俊介法  固结度  京张高铁

Study on Surcharge Preloading of Backfill for Long and Large Open-excavated Tunnel
Yu Jinjiang,Wang Jiujun,Yue Ling,Ling Yunpeng.Study on Surcharge Preloading of Backfill for Long and Large Open-excavated Tunnel[J].Railway Investigation and Surveying,2020(1):49-53,59.
Authors:Yu Jinjiang  Wang Jiujun  Yue Ling  Ling Yunpeng
Institution:(Beijing-Zhangjiakou Intercity Railway Co.,Ltd.,Beijing 100070,China;China Railway Engineering Design and Consulting Group Co.,Ltd.,Beijing 100055,China)
Abstract:Surcharge preloading is an effective method to deal with soft foundation,which can accelerate the consolidation settlement of soft foundation. In order to study the feasibility of using surcharge preloading to accelerate consolidation settlement of backfill soil in open-excavated tunnel,taking the Donghuayuan Tunnel of Beijing-Zhangjiakou High-speed Railway as the engineering background,the structural overburden is checked by finite element software,and the maximum overburden thickness of open-excavated tunnel with different lining types is obtained. The surcharge preloading of backfill for open-excavated tunnel is studied by improved Takagi Shunsuke method,the consolidation degree of backfill under different surcharge loading height is obtained. The results show that:( 1) Under the condition of surcharge loading,the consolidation degree of backfill decreases in power function form with the increase of the thickness of overburden soil,and the surcharge loading height has little effect on the consolidation degree.( 2) Under the same conditions of overburden soil,the surcharge loading height has little effect on the height of the retained soil;( 3) Surcharge preloading can accelerate the consolidation settlement of backfill in open-excavated tunnel,which is a feasible scheme.
Keywords:Open-excavated tunnel  Backfilling  Surcharge preloading  Improved Takagi Shunsuke method  Consolidation degree  Beijing-Zhangjiakou High-speed Railway
本文献已被 CNKI 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号