编组站阶段计划与动态车流的耦合及调整研究
引用本文:薛锋,赵蕾,范千里.编组站阶段计划与动态车流的耦合及调整研究[J].铁道学报,2020(2):18-26.
作者姓名:薛锋  赵蕾  范千里
作者单位:西南交通大学;西南交通大学综合交通大数据应用技术国家工程实验室;西南交通大学综合交通运输智能化国家地方联合工程实验室;中国建筑西南设计研究院有限公司市政设计院
基金项目:国家自然科学基金(61203175);四川省科技计划(2019YJ0211);综合交通大数据应用技术国家工程实验室开放基金(CTBDAT201902,CTBDAT201911)
摘    要:编组站的阶段计划在执行过程中,会受到车流波动的影响,衡量阶段计划与动态车流之间的耦合关系,并将车流波动控制在一定的范围,对车站调度工作具有重要意义。在车站阶段计划执行资源已确定的条件下,分析列车晚点时间、解体作业时间、编组作业时间的容许变动范围,给出车站阶段计划与动态车流耦合度的计算方法。当车流的变化超出容许范围时,在不改变原有解编顺序的基础上,对车流进行一定幅度的调配,以减小对车站整体作业的影响,并以此为目标建立优化模型。算例表明,车站阶段作业计划易受到达列车晚点、列车编组内容改变、解编作业晚点等因素的影响,进行适当的车流调配可在一定程度上提高阶段计划与动态车流的耦合度。

关 键 词:铁路运输  编组站  阶段计划  动态车流  耦合度

Coupling and Adjustment of Stage Plan and Dynamic Railcar Flow in Marshalling Station
XUE Feng,ZHAO Lei,FAN Qianli.Coupling and Adjustment of Stage Plan and Dynamic Railcar Flow in Marshalling Station[J].Journal of the China railway Society,2020(2):18-26.
Authors:XUE Feng  ZHAO Lei  FAN Qianli
Institution:(School of Transportation and Logistics,Southwest Jiaotong University,Chengdu 611756,China;National Engineering Laboratory of Integrated Transporation Big Data Application Technology,Chengdu 611756;National United Engineering Laboratory of Integrated and Intelligent Transportation,Southwest Jiaotong University,Chengdu 611756,China;Municipal Design Institute,China Southwest Architectural Design and Research Institute Co.,Ltd.,Chengdu 610041,China)
Abstract:The stage plan of marshalling station will be affected by the fluctuation of railcar flow in the process of implementation.A way to measure the coupling relationship between the stage plan and the dynamic railcar flow and to control the railcar flow in a certain range is very important for the dispatching operation of marshalling stations.The allowable variation ranges of train delay time,the break-up operation time and marshalling operation time were analyzed under the condition that the implementation resources of the station stage plan had been determined.Then the method of calculating the coupling degree between the station stage plan and the dynamic railcar flow was given.An optimization model was established to reduce the impact on the overall operation of a station when the change of railcar flow was beyond the allowable range,and railcar sources were adjusted without changing the original disassembling and marshalling sequence.The example shows that the station stage plan is susceptible to the factors such as the arrival time of train,the difference between the actual arrival of train and the expected arrival of train,and the fluctuation range of break-up operation time and marshalling operation time.The coupling degree between the stage plan and the dynamic railcar flow can be improved to a certain extent by reasonable railcar flow assignment.
Keywords:railway transportation  marshalling station  stage plan  dynamic railcar flow  coupling degree