区间隧道长距离密贴下穿既有车站变形特征分析
引用本文:高太平,申健昊,闫建龙,李刚,李昊炎,沈宇鹏.区间隧道长距离密贴下穿既有车站变形特征分析[J].铁道建筑技术,2020(5):94-99.
作者姓名:高太平  申健昊  闫建龙  李刚  李昊炎  沈宇鹏
作者单位:中铁四局集团第三建设有限公司;北京交通大学
基金项目:国家重点研发计划资助项目(2017YFC0805305)。
摘    要:既有结构在隧道长距离密贴下穿过程中极易受到扰动而产生较大沉降,为分析既有结构的安全性,依托北京地铁19号线区间隧道零距离下穿既有4号线新宫站工程,将数值模拟与现场监测相结合,研究既有结构在施工全过程中的沉降变形特征。结论表明:(1)对地层进行全断面深孔注浆加固可有效控制既有结构沉降;(2)下穿段区间隧道二衬施作引起既有结构沉降最大,施工全过程中既有车站沉降小于3 mm的限值;(3)两侧疏散口沉降集中发生在既有站两侧隧道施工过程中,施工全过程中既有疏散口沉降小于3 mm的限值。

关 键 词:下穿工程  既有车站  仿真计算  现场监测  变形特征

Analysis of Deformation Characteristics of Long-distance Interval Tunnel Closely Underneath Crossing the Existing Station
GAO Taiping,SHEN Jianhao,YAN Jianlong,LI Gang,LI Haoyan,SHEN Yupeng.Analysis of Deformation Characteristics of Long-distance Interval Tunnel Closely Underneath Crossing the Existing Station[J].Railway Construction Technology,2020(5):94-99.
Authors:GAO Taiping  SHEN Jianhao  YAN Jianlong  LI Gang  LI Haoyan  SHEN Yupeng
Institution:(The Third Construction Co.,Ltd of CTCE Group,Tianjin 300011,China;Beijing Jiaotong University,Beijing 100044,China)
Abstract:The existing structure is susceptible to disturbance and tends to produce large settlement in the process of longdistance tunnel closely underneath crossing.In order to analyze the security of existing structure,the numerical simulation and on-site monitoring were combined to study the settlement and deformation characteristics of existing structure in the whole process of interval tunnel of Beijing Metro Line 19 closely underneath crossing the existing Xin Gong station of line 4.The results are as follows:(1)the settlement of existing structure can be effectively controlled with the technology of full section deep hole grouting.(2)The settlement of existing structure caused by the construction of secondary lining in the underneath crossing section is the largest,and the settlement of existing station is less than the limit value of 3 mm in the whole construction process.(3)The settlement of evacuation exits on both sides mainly occurs in the construction process of tunnels on both sides of existing station,and the settlement is less than the limit value of 3 mm in the whole construction process.
Keywords:underneath crossing engineering  existing station  simulative calculation  on-site monitoring  deformation characteristic