首页 | 本学科首页   官方微博 | 高级检索  
     检索      

中巴经济走廊沿河台地特征及铁路选线要点
引用本文:赵亚祥,姚令侃,魏永幸,黄艺丹,Sarfraz Ali.中巴经济走廊沿河台地特征及铁路选线要点[J].铁道建筑,2020(7):102-106.
作者姓名:赵亚祥  姚令侃  魏永幸  黄艺丹  Sarfraz Ali
作者单位:西南交通大学土木工程学院;西南交通大学高速铁路线路工程教育部重点实验室;西南交通大学陆地交通地质灾害防治技术国家工程实验室;中铁二院工程集团有限责任公司;College of Civil Engineering
基金项目:国家自然科学基金(41571004,41902302);国家重点研发计划(2016YFC0802206);中铁二院工程集团有限责任公司科研项目(KYY2020054);中央高校基本科研业务费科技创新项目(国家培育项目)(2682018GJPY01)。
摘    要:中巴经济走廊是我国"一带一路"倡议的先试区和重点项目区,拟建中巴铁路是其重要组成部分。走廊区域经历了多次强隆升作用和冰川作用,存在河流阶地、洪积扇、泥石流扇、冰碛台地等沿河台地。以中巴经济走廊Thakot至Khunjerab段为研究区段,归纳总结各类沿河台地的分布特征以及铁路选线的可利用性。结果表明:由于强隆升作用导致河流阶地拔河高度较大并出现了泥石流扇抬升后成为流通区的现象,Ⅰ级阶地和老扇面区成为可利用的地形;小冰期时冰川活动未企及的冰碛台地也可利用。研究结果有益于中巴铁路线路方案的优化。

关 键 词:客货共线铁路  选线设计  中巴经济走廊  沿河台地  强隆升作用  冰川作用

Features of Platforms Along River in China-Pakistan Economic Corridor and Railway Location Points
Institution:(College of Civil Engineering,Southwest Jiaotong University,Chengdu 610031,China;MOE Key Laboratory of High-speed Railway Engineering,Southwest Jiaotong University,Chengdu 610031,China;National Engineering Laboratory of Land Traffic Geological Disaster Prevention Technology,Southwest Jiaotong University,Chengdu 610031,China;China Railway Eryuan Engineering Group Co.Ltd.,Chengdu 610031,China;College of Civil Engineering,National University of Sciences and Technology(NUST),Pakistan 24080)
Abstract:China-Pakistan Economic Corridor is a pilot and key project of"The Belt and Road",and the proposedChina-Pakistan railway is an important part of this corridor.The corridor has experienced many times of strong upliftand glaciation,and there are some types of platforms along rivers such as river terrace,alluvial fan,debris flow fan andmoraine platform.The section from Thakot to Khunjerab of China-Pakistan Economic Corridor was selected as the studyarea,the distribution features of various platforms along the river and the availability of railway location weresummarized,and then the railway location points were presented.The results show that the height of terrace over riverbed is large and the debris flow fan becomes a circulation area as a result of strong uplift,then the first stage terrace andthe old fan area become available terrain.Moraine platforms which were not covered by glacial activity during the LittleIce Age are also available.The research results are beneficial for the optimization of China-Pakistan railway line scheme.
Keywords:mixed passenger and freight railway  location design  China-Pakistan Economic Corridor  platformsalong river  strong uplift  glaciation
本文献已被 CNKI 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号