首页 | 本学科首页   官方微博 | 高级检索  
     

墩柱(肋板)工艺流程及施工方法
引用本文:张 媛. 墩柱(肋板)工艺流程及施工方法[J]. 交通标准化, 2012, 0(7): 119-120
作者姓名:张 媛
作者单位:邢台市公路工程质量监督站,河北邢台,054000
摘    要:介绍墩柱(肋板)施工的工艺流程,包括施工准备、定位放线、加工绑扎钢筋、支设模板、砼浇筑、拆模、养生、成品检验,并阐述施工方法,具有一定的现实意义。

关 键 词:墩柱  肋板  工艺流程

Technological Process and Construction Method for Pier Column(Ribbed Slab)
ZHANG Yuan. Technological Process and Construction Method for Pier Column(Ribbed Slab)[J]. Communications Standardization, 2012, 0(7): 119-120
Authors:ZHANG Yuan
Affiliation:ZHANG Yuan(Xingtai City Highway Engineering Quality Supervision Station,Xingtai 054000,China)
Abstract:This paper introduces the technological process of pier column and ribbed slab,such as const-ruction preparation,positioning actinomycetes,processing and banding steel,setting template,pouring concrete,form removalling,maintenance as well as product testing,and describes the construction method,which has a certain practical significance.
Keywords:pier column  ribbed slab  technological process
本文献已被 CNKI 维普 万方数据 等数据库收录!
点击此处可从《交通标准化》浏览原始摘要信息
点击此处可从《交通标准化》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号