接触网过渡施工技术
引用本文:李和刚.接触网过渡施工技术[J].铁道建筑技术,2011(1):59-62.
作者姓名:李和刚
作者单位:中铁十二局集团电气化工程有限公司,太原,030024
摘    要:为配合线路施工,接触网就涉及到过渡工程,接触网过渡工程依据线路改造的不同情况,采取区间曲内拨转、区间曲外拨转、区间双线同时拨转、车站过渡施工。区间上下行换边、新建网与既有网接火等方案合理组织,为配合轨道改建工程创造施工开通条件,并保证接触网改造施工顺利进行。

关 键 词:接触网  铁道电气化  铁路提速  过渡方案

Transitional Construction Technologies of Overhead Contact Line
Li Hegang.Transitional Construction Technologies of Overhead Contact Line[J].Railway Construction Technology,2011(1):59-62.
Authors:Li Hegang
Institution:Li Hegang(China Railway 12~(th) Bureau Group Co.Ltd.,Taiyuan 030024,China)
Abstract:To coordinate with line constructions,transitional engineering is needed in the overhead contact line,which depends on the different situations of line transformations,adopting toggling inside the section,toggling outside the section,sectional double-line simultaneous toggling,and station transitional construction.Schemes of side change in up-and-down traffic and fire exchange between the newly-built lines and existing lines are rationally organized,so as to create construction operation conditions for trac...
Keywords:overhead contact line  railway electrification  railway speedup  transitional scheme  