首页 | 本学科首页   官方微博 | 高级检索  
     

既有线提速接触网硬点消除的探讨
引用本文:王日新. 既有线提速接触网硬点消除的探讨[J]. 铁路工程造价管理, 2007, 22(5): 9-11
作者姓名:王日新
作者单位:哈尔滨铁路局,机务处,哈尔滨,150001
摘    要:既有线第6次大面积提速给接触网平顺性提出了更高的要求,同时也给接触网的施工和维护单位的改造、检护、维修工作提出了新的课题。此文结合哈尔滨铁路局在既有线接触网整治中的成功做法和经验,就既有线提速以后如何消除接触网硬点和提高接触网平顺性进行了有益探讨。

关 键 词:既有线提速  高速铁路  接触网  平顺性  硬点消除
文章编号:1007-9890(2007)05-0009-03
修稿时间:2007-05-04

Exploration of eliminating catenary hard spots after speed increase of existing railway lines
Wang Rixin. Exploration of eliminating catenary hard spots after speed increase of existing railway lines[J]. Railway Engineering Cost Management, 2007, 22(5): 9-11
Authors:Wang Rixin
Abstract:The sixth speed increase of existing lines across a greater area sets forth higher smoothness requirements of the overhead contact system,and also poses a new research study to the catenary installation and maintenance units in the work of renovation,inspection and maintenance of the system.This article,combined with the successful methods used for and experience in the catenary rectification of the existing lines under the Harbin Railway Administration,makes a useful exploration of how to remove the hard spots and improve the smoothness of the overhead contact system after the speed raise of the existing lines.
Keywords:Speed increase of existing lines  high speed railway  catenary  smoothness  elminate hard spots
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号