客运专线运架梁施工质量关键问题及对策
引用本文:田静,戴宝瑞. 客运专线运架梁施工质量关键问题及对策[J]. 铁道建筑技术, 2010, 0(11): 36-38
作者姓名:田静  戴宝瑞
作者单位:中铁十九局集团第六工程有限公司,江苏元锡214045
摘    要:京沪高速铁路采用高标准、高技术来建设,其中天津特大桥段的箱梁架设施工是日后施工的基础。施工采用TLJ900型架桥机整套设备,将箱梁提运、架设并安装到桥墩上,过程中由顶升系统来对箱梁进行三点受力调平,调平后再进行支座砂浆灌筑,这两个环节需要严保质量,才能为日后的施工打下坚实的基础。

关 键 词:箱梁架设  支座砂浆  顶升系统  错台  梁面不平整

Key Issues and Countermeasures in Construction Quality of PDL Carrying and Erecting Girders
Tian Jing,Dai Baorui. Key Issues and Countermeasures in Construction Quality of PDL Carrying and Erecting Girders[J]. Railway Construction Technology, 2010, 0(11): 36-38
Authors:Tian Jing  Dai Baorui
Affiliation:(China Railway 19^th Bureau Group Co.Ltd.,Wuxi 214045,China)
Abstract:Beijing-Shanghai High-speed Railway is of high standard and high-tech,in which box girder erection in Tianjin Extra-large Bridge is the foundation of following constructions.It adopts TLJ900 Bridge-erection Machine equipment package. Box girders are carried,erected and installed in bridge piers,during which the jacking system shall carry out three-point force leveling on the box girders.After leveling,bearing mortar is poured.The quality of these two steps should be ensured,to lay a solid foundation for construction in the future.
Keywords:box girder erection  bearing mortar  jacking system  slab staggering  uneven beam surface