首页 | 本学科首页   官方微博 | 高级检索  
     

重力式码头与板桩码头衔接技术
引用本文:刘兵强,顾新星,邵昌浩. 重力式码头与板桩码头衔接技术[J]. 水运工程, 2017, 0(S1): 98-100
作者姓名:刘兵强  顾新星  邵昌浩
作者单位:北京水规院京华工程管理有限公司,北京 100101,北京水规院京华工程管理有限公司,北京 100101,北京水规院京华工程管理有限公司,北京 100101
摘    要:针对重力式码头与板桩码头衔接段施工穿越抛石层、后方漏砂等问题,结合两个工程实例进行研究。采取冲击钻施工工艺穿越抛石层成槽,使用高压旋喷桩加固地基、防止后方漏砂。

关 键 词:重力式码头;板桩码头;衔接;高压旋喷桩

Linkage technology of gravity wharf and sheet-pile wharf
LIU Bingqiang,GU Xinxing and SHAO Changhao. Linkage technology of gravity wharf and sheet-pile wharf[J]. Port & Waterway Engineering, 2017, 0(S1): 98-100
Authors:LIU Bingqiang  GU Xinxing  SHAO Changhao
Affiliation:PDI Jinghua Engineering Management Co.,Ltd.,Beijing 100101,China,PDI Jinghua Engineering Management Co.,Ltd.,Beijing 100101,China and PDI Jinghua Engineering Management Co.,Ltd.,Beijing 100101,China
Abstract:Combined with 2 practical construction cases,the cutting through riprap layer and rear sand leakage of linkage construction is studied,which links gravity wharf to sheet-pile wharf. Masonry drill is used to cut through riprap layer. High pressure grouting pile is used to prevent rear sand leakage.
Keywords:
点击此处可从《水运工程》浏览原始摘要信息
点击此处可从《水运工程》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号