李渡长江大桥主塔施工技术 |
| |
作者单位: | 中交四航局第一工程有限公司 广东广州510500 |
| |
摘 要: | 根据斜拉桥主塔的结构特点,结合实际介绍了施工中采用的主要工艺、施工重难点。
|
关 键 词: | 斜拉桥 主塔 施工 重点 |
The Construction Technologies of Main Towers of Lidu Yangtze River Bridge |
| |
Authors: | LI Jun-yong LIANG Xiong-yu |
| |
Abstract: | This paper presents the main technologies adopted in the construction and major construction difficulties of main towers of cable stayed bridge. |
| |
Keywords: | cable stayed bridge main tower construction key point |
本文献已被 CNKI 等数据库收录! |