摘    要:乐昌至广州高速公路K253+353河尾大桥薄壁空心高墩施工组织设计采用PJ-200悬臂模板(即爬模施工)和塔吊提升大块钢模的方法施工(即翻模施工)相结合的方式,取得了较好的经济效益。

关 键 词:空心薄壁墩  高墩  施工方法

Construction Organizational Design for High Hollow Thin-wall Pier of Viaduct Bridge
FENG Shimin. Construction Organizational Design for High Hollow Thin-wall Pier of Viaduct Bridge[J]. Guangdong Highway Communications, 2014, 0(4): 50-54
Authors:FENG Shimin
Affiliation:FENG Shimin (Guangdong Guanyue Road & Bridge Co., Ltd., Guangzhou 510630)
Abstract:PJ-200 Cantilever formwork ( climbing formwork ) and big steel formwork lifted with tower crane ( turnover formwork construction) have been adopted for the construction of high hollow thin-wall pier of Hewei Bridge at Km:253+353 of Lechang-Guangzhou Expressway, which has achieved good economic benefits.
Keywords:hollow thin-wall pier  high pier  construction method