长螺旋钻引孔取土对PHC桩沉桩的改善 |
| |
引用本文: | 柳立安.长螺旋钻引孔取土对PHC桩沉桩的改善[J].北方交通,2012(3):76-78. |
| |
作者姓名: | 柳立安 |
| |
作者单位: | 唐山市交通勘察设计院有限公司,唐山,063000 |
| |
摘 要: | 通过工程实例,详细论述长螺旋钻引孔取土方案的选择、实施及引孔后管桩的施工效果,可为类似工程提供借鉴和参考。
|
关 键 词: | PHC桩 沉桩 长螺旋钻孔机 引孔取土 桩基施工 |
Improvement on PHC Pile Sinking Through Taking Soil Drawing Hole By Long Auger |
| |
Abstract: | Through practical case,selection and implementation scheme of taking soil drawing hole by long auger and construction result of tubular pile after drawing hole are discussed in detail,providing references for similar engineering. |
| |
Keywords: | PHC pile Pile sinking Long auger bored pile Taking soil drawing hole Pile foundation construction |
本文献已被 CNKI 万方数据 等数据库收录! |
|