首页 | 本学科首页   官方微博 | 高级检索  
     检索      

梅岭关隧道高应力区段施工技术
引用本文:王金磊.梅岭关隧道高应力区段施工技术[J].兰州铁道学院学报,2014(1):15-18,22.
作者姓名:王金磊
作者单位:中铁十八局集团第二工程有限公司,河北唐山064000
摘    要:梅岭关隧道穿越高地应力区,针对此区段隧道拱顶出现的混凝土开裂及剥落,进行了支护参数的优化分析.通过支护参数的优化与调整,有效阻止了隧道拱顶沉降及开裂.

关 键 词:梅岭关隧道  变更情况  优化与调整  塌方

Construction Technology of Meilingguan Tunnel in High Stress Paragraph
WANG Jin-lei.Construction Technology of Meilingguan Tunnel in High Stress Paragraph[J].Journal of Lanzhou Railway University,2014(1):15-18,22.
Authors:WANG Jin-lei
Institution:WANG Jin-lei (China Raiway 18th Construction Bureau Group Second Engineering Co. , Ltd. , Tangshan 064000,China)
Abstract:During construction of the Meilingguan tunnel,the tunnel passed through a period of high stress paragraph.For concrete cracking and spalling of tunnel vaults appear in this section, this paper were supported parameters optimization analysis.By supporting parameters optimiza-tion and readj ustment,effectively prevent the tunnel vault settlement and cracking.
Keywords:Meilingguan tunnel  change information  optimization and adj ustment  landslide