首页 | 本学科首页   官方微博 | 高级检索  
     


An optimization model for bus fleet replacement with budgetary and environmental constraints
Authors:William Emiliano  Filipe Alvelos  José Telhada  Edgar A. Lanzer
Affiliation:1. Department of Industrial Production Management, Faculty of Technology, Assessoritec, Joinville, Brazil;2. ALGORITMI Research Center, University of Minho, Guimar?es, Portugal id6022@alunos.uminho.pt"ORCIDhttps://orcid.org/0000-0002-6743-7341;4. ALGORITMI Research Center, University of Minho, Guimar?es, Portugal "ORCIDhttps://orcid.org/0000-0002-1851-4339;5. ALGORITMI Research Center, University of Minho, Guimar?es, Portugal "ORCIDhttps://orcid.org/0000-0002-8465-3679;6. Department of Production Engineering, UNISOCIESC Centro Universitário Tupy, Joinville, Brazil
Abstract:ABSTRACT

As maintenance and operation costs increase with usage over time, equipment is replaced when the value of new equipment is more attractive. Some methods have been developed to solve this problem. In the public transport sector, such problems are frequently analyzed by fleet managers and determined by bus age restriction regulations. We propose an Integer Programming model that integrates both budgetary and environmental constraints (CO2 emissions) which, as far as we know, have not previously been studied in conjunction. The study aims to determine the optimal replacement plan for a fleet of diesel buses of different size, age, maintenance costs and emissions rates, with new (less polluting) diesel buses over a time horizon of 50 years. The results indicate that it is possible to reduce emissions with a low annual budget using an optimal replacement policy.
Keywords:Bus fleet replacement  transportation management  Integer Programming  operation research  environmental constraints
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号