首页 | 本学科首页   官方微博 | 高级检索  
     检索      

上海长江大桥水上非通航孔墩身预制安装技术
引用本文:叶华成.上海长江大桥水上非通航孔墩身预制安装技术[J].桥梁建设,2007(5):55-58.
作者姓名:叶华成
作者单位:上海长江隧桥建设发展有限公司,上海,201209
摘    要:上海长江隧桥工程是世界最长的桥隧结合工程,其中的上海长江大桥非通航孔墩身采用分节预制安装施工工艺。详细介绍该桥墩身预制和墩身安装施工工艺,尤其是墩身接头施工技术。

关 键 词:桥墩  预制  安装  施工工艺
文章编号:1003-4722(2007)05-0055-04
修稿时间:2007-09-18

Techniques for Precasting and Installation of Pier Shafts of Non-Navigable Spans of Shanghai Changjiang River Bridge
YE Hua-cheng.Techniques for Precasting and Installation of Pier Shafts of Non-Navigable Spans of Shanghai Changjiang River Bridge[J].Bridge Construction,2007(5):55-58.
Authors:YE Hua-cheng
Institution:Shanghai Changjiang River Tunnel and Bridge Construction Development Co., Ltd., Shanghai 201209, China
Abstract:Shanghai Changjiang River Tunnel and Bridge is currently the longest bridge and tunnel combination project in the world.In the construction of pier shafts of the non-navigable spans of the bridge part,the workmanship of segment precasting and installation was applied.In this paper,the workmanship of the precasting and installation of the pier shafts,particularly the construction techniques of the joints in the pier shafts,is described in details.
Keywords:pier  precasting  installation  workmanship
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号