客运专线64m PRC简支梁节段预制3200t造桥机整孔架设施工技术
引用本文:陶建山.客运专线64m PRC简支梁节段预制3200t造桥机整孔架设施工技术[J].桥梁建设,2007(A02):49-53.
作者姓名:陶建山
作者单位:中铁大桥局温福铁路福建段三标指挥部,福建宁德352100
摘    要:温福铁路白马河大桥64m简支混凝土箱梁,采用节段预制,3200t造桥机整孔架设的施工方案。介绍节段梁块的预制、存放和运输;大型造桥机及其架梁施工和拖拉走行;预应力束张拉时考虑主桁梁对梁体作用力的影响和控制等成功经验。

关 键 词:箱形梁  节段预制  造桥机  整孔架设  桥梁施工
文章编号:1003-4722(2007)S2-0049-05
修稿时间:2007-07-31

Construction Techniques for Segment Precasting and Full Span Erection of 64-m Span Simply-Supported PRC Box Girders for Passenger Dedicated Railway by 3 200-t Overhead Launching Gantry
TAO Jian-shan.Construction Techniques for Segment Precasting and Full Span Erection of 64-m Span Simply-Supported PRC Box Girders for Passenger Dedicated Railway by 3 200-t Overhead Launching Gantry[J].Bridge Construction,2007(A02):49-53.
Authors:TAO Jian-shan
Institution:Construction Headquarters of Contract III of Fujian Section, Wenzhou-Fuzhou Railway, China Zhongtie Major Bridge Engineering Group Co., Ltd., Ningde 352100, China
Abstract:The construction scheme of segment precasting and full span girder erection by 3 200-t overhead launching gantry was adopted for the 64-m span simply-supported concrete box girders of Baima River Bridge on Wenzhou-Fuzhou Railway. This paper presents the successful experiences in aspect of precasting, storage and transportation of the segments of the concrete box girders, application of the large capacity overhead launching gantry, erection of the girders by the gantry, hauling and traveling of the gantry, and consideration and control of influence of action forces from the main truss girder of the gantry on the concrete box girders at the time the prestressing strands were jacked.
Keywords:box girder  segment precasting  overhead launching gantry  full span erection  bridge construction