首页 | 本学科首页   官方微博 | 高级检索  
     检索      

湛江海湾大桥斜拉桥设计新技术
引用本文:张强,高宝峰,刘承虞.湛江海湾大桥斜拉桥设计新技术[J].桥梁建设,2007(A02):1-3,17.
作者姓名:张强  高宝峰  刘承虞
作者单位:中铁大桥勘测设计院有限公司,湖北武汉430050
摘    要:湛江海湾大桥为主跨480m的双塔双索面混合梁斜拉桥,重点介绍该桥在结构设计及塔墩防撞方面所采取的几项新技术。

关 键 词:斜拉桥  混合梁  防撞结构  桥梁设计
文章编号:1003-4722(2007)S2-0001-03
修稿时间:2007-07-20

New Techniques for Design of Cable-Stayed Bridge of Zhanjiang Bay Bridge
ZHANG Qiang , GAO Bao-f eng , LIU Cheng-yu.New Techniques for Design of Cable-Stayed Bridge of Zhanjiang Bay Bridge[J].Bridge Construction,2007(A02):1-3,17.
Authors:ZHANG Qiang  GAO Bao-f eng  LIU Cheng-yu
Abstract:Zhanjiang Bay Bridge is a double pylon and double cable plane hybrid girder cablestayed bridge with a main span 480 m. In this paper, several new techniques having been applied to the structural design and pylon pier collision-proof protection of the bridge are mainly dealt with.
Keywords:cable-stayed bridge  hybrid girder  collision-proof structure  bridge design
本文献已被 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号