首页 | 本学科首页   官方微博 | 高级检索  
     检索      

漳州战备大桥总体设计
引用本文:汤少青,蔡文生,陈亨锦.漳州战备大桥总体设计[J].桥梁建设,2002(1):1-4.
作者姓名:汤少青  蔡文生  陈亨锦
作者单位:1. 漳州市公路局,福建,漳州,363000
2. 铁道第一勘察设计院,甘肃,兰州,730000
摘    要:漳州战备大桥的主桥采用主跨132.0m部分斜拉桥,引桥采用跨度32.0m的连续梁。介绍了该桥的总体设计,包括主桥方案比选,主、引桥设计,景观设计等内容。

关 键 词:漳州战备大桥  部分斜拉桥  连续梁  方案比较  桥梁设计
文章编号:1003-4722(2002)01-0001-04
收稿时间:2001-10-31
修稿时间:2001年10月31

Overall Design of Zhangzhou War Preparation Bridge
Shang ShaoQing;Cai WenSheng;Chen HengJin.Overall Design of Zhangzhou War Preparation Bridge[J].Bridge Construction,2002(1):1-4.
Authors:Shang ShaoQing;Cai WenSheng;Chen HengJin
Abstract:The main bridge of Zhangzhou War Preparation Bridge uses partial cable-stayed bridge with 132.0 m, and approach bridges use continuous beam with 32.0 m span. The overall design of the bridge, which include main bridge project comparison, design of main bridge and approach bridge, scene design etc is introduced.
Keywords:Zhangzhou War Preparation Bridge  partial cable-stayed bridge continuous beam project comparison bridge design
本文献已被 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号