首页 | 本学科首页   官方微博 | 高级检索  
     检索      

先简支后连续箱梁模型弹性试验研究
引用本文:吴成福,伍军.先简支后连续箱梁模型弹性试验研究[J].中南公路工程,2006,31(3):53-55,66.
作者姓名:吴成福  伍军
作者单位:中铁四局集团有限公司,安徽合肥230023
摘    要:详细介绍了32 m先简支后连续箱梁模型的试验情况.通过逐级加载试验,得到了模型梁在弹性阶段的竖向位移、纵向应力、支座反力的规律,并对试验结果进行分析.

关 键 词:先简支后连续  箱梁  模型
文章编号:1002-1205(2006)03-0053-03
收稿时间:2005-04-30
修稿时间:2005-04-30

Experimentation Analysis of the Precast Prestressed Continuous Concrete Box Girder in Elastic Phase
WU Chengfu, WU Jun.Experimentation Analysis of the Precast Prestressed Continuous Concrete Box Girder in Elastic Phase[J].Central South Highway Engineering,2006,31(3):53-55,66.
Authors:WU Chengfu  WU Jun
Institution:China Railway Fouth Group CO. LTD, Hefei, Anhui 230023, China
Abstract:This is about details of contious 32m prefabricated box girder model tests. The loads add on girder were increased step-by-step, and record the girder vertical displacement longitudinal stress, bearing load. Conclusion is get by analyses the test data.
Keywords:prefabricated box girder  continuous girder  model
本文献已被 CNKI 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号