首页 | 本学科首页   官方微博 | 高级检索  
     

公和斜拉桥的合拢技术
引用本文:杜蓬娟,黄才良,张哲. 公和斜拉桥的合拢技术[J]. 公路, 2003, 0(9): 18-21
作者姓名:杜蓬娟  黄才良  张哲
作者单位:大连理工大学土木工程系,大连市,116024
摘    要:一般情况下,斜拉桥的合拢指的是梁与梁之间的合拢,即在主梁上预留一定长度的合拢段。公和斜拉桥根据该桥的施工特点,采用一种新颖的合拢方案,即在滑动模架上连续施工主梁,直到两边的主梁与边墩合拢。这种新方法的应用成功,为斜拉桥的施工方法及合拢方式的创新提供了宝贵的实践经验。

关 键 词:斜拉桥 合拢技术 桥梁施工 贝雷梁 施工方法 滑动模架
文章编号:0451-0712(2003)09-0018-03

Closure Technology of Gonghe Cable-Stayed Bridge
DU Peng juan,HUANG Cai liang,ZHANG Zhe. Closure Technology of Gonghe Cable-Stayed Bridge[J]. Highway, 2003, 0(9): 18-21
Authors:DU Peng juan  HUANG Cai liang  ZHANG Zhe
Abstract:Closure of cable stayed bridge generally means closure of beam and beam,namely, closure length in the main beam On the basis of the charaecters of construction a sort of novel scheme for closure is adopted in the Gonghe cable stayed bridge construction By using the moving template method,the main beam is cast in place with the moving template,until the beam reaches to the side pier The successful application of the new method provides the precious experience for the innovation of construction and closure of cable stayed bridge
Keywords:cable stayed bridge  moving template  closure  Beiley beam
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号