首页 | 本学科首页   官方微博 | 高级检索  
     

新旧码头接头段基床整平工艺探讨
引用本文:林旺孙. 新旧码头接头段基床整平工艺探讨[J]. 水运工程, 2006, 0(7): 31-32
作者姓名:林旺孙
作者单位:广东省航盛建设集团有限公司,广东,广州,511442
摘    要:针对目前重力式码头续建二期工程在新旧码头接头段基床整平施工工艺中存在的问题,提出“趁高潮”施工的工艺,并对此工艺所涉及的有关问题进行讨论。

关 键 词:重力式码头  续建工程  接头段
文章编号:1002-4972(2006)07-0031-02
收稿时间:2006-05-12
修稿时间:2006-05-12

On Bed Leveling Technology for the Connecting Part of New-Old Wharves
LIN Wang-sun. On Bed Leveling Technology for the Connecting Part of New-Old Wharves[J]. Port & Waterway Engineering, 2006, 0(7): 31-32
Authors:LIN Wang-sun
Affiliation:Guangdong Hangsheng Construction Group Co., Ltd., Guangzhou 511442, China
Abstract:To counter the problems of bed leveling construction technology for the connecting part of new-old wharves in Phase II Extension Project of gravity wharf,this paper puts forward the construction technology of "construction at high tide",and discusses some problems related to this technology.
Keywords:gravity wharf  extension project  connecting part  
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号