首页 | 本学科首页   官方微博 | 高级检索  
     

兰州小西湖黄河大桥剪力滞效应分析及试验研究
引用本文:李龙生. 兰州小西湖黄河大桥剪力滞效应分析及试验研究[J]. 城市道桥与防洪, 2006, 0(4): 95-97
作者姓名:李龙生
作者单位:兰州市政研究所,甘肃,兰州,730000
摘    要:小西湖黄河大桥为部分斜拉桥,采用薄壁箱形截面梁,为了解箱梁的剪力滞效应,对其进行了剪力滞效应的有限元理论分析和模型试验研究,结果表明,试验结果与理论分析结果基本相符。

关 键 词:剪力滞  部分斜拉桥  模型试验  薄壁箱形梁
文章编号:1009-7716(2006)04-0095-03
收稿时间:2006-04-24
修稿时间:2006-04-24

Analysis and Test Study of Shearing Stagnant Effect of Huanghe Bridge in Xiaoxihu Lake of Lanzhou
Li Longsheng. Analysis and Test Study of Shearing Stagnant Effect of Huanghe Bridge in Xiaoxihu Lake of Lanzhou[J]. Urban Roads Bridges & Flood Control, 2006, 0(4): 95-97
Authors:Li Longsheng
Affiliation:Li Longsheng
Abstract:Huanghe Bridge on Xiaoxihu Lake is partially cable-stayed bridge,which uses the thin-wall box sectional beam.In order to solve the shearing stagnant effect of the box beam,it is to carry out the finite element theoretical analysis and the model test study of the shearing stagnant effect.The result makes clearly that the test result basically tallies with the theoretical analysis result.
Keywords:shearing stagnancy  partial cable-stayed bridge  model test  thin-wall box beam
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号