首页 | 本学科首页   官方微博 | 高级检索  
     检索      

向莆铁路青云山特长隧道F9断层带涌水原因分析与加固处理方案
引用本文:毛建安.向莆铁路青云山特长隧道F9断层带涌水原因分析与加固处理方案[J].铁道建筑技术,2011(8):33-36.
作者姓名:毛建安
作者单位:中铁第一勘察设计院工程咨询监理有限责任公司,西安,710043
摘    要:对向莆铁路青云山特长隧道F9断层带的涌水原因进行了分析,对断层带涌水、坍塌的加固处理方案进行了论述,并谈了几点体会。

关 键 词:隧道施工  断层涌水分析  加固措施

The Analysis and Exposition on the Causes of F9 Fault Belt Water Gushing and Strengthening of Qingyunshan Mountain Extra-long Tunnel of Xiangpu Railway
Mao Jianan Survey , Design Institute Group Co.Ltd.,Xi'an ,China.The Analysis and Exposition on the Causes of F9 Fault Belt Water Gushing and Strengthening of Qingyunshan Mountain Extra-long Tunnel of Xiangpu Railway[J].Railway Construction Technology,2011(8):33-36.
Authors:Mao Jianan Survey  Design Institute Group CoLtd  Xi'an  China
Institution:Mao Jianan (China Railway 1~(st) Survey and Design Institute Group Co.Ltd.,Xi'an 710043,China)
Abstract:The causes to the F9 Fault Belt Water Gushing of Qingyunshan Mountain Extra-long Tunnel of Xiangpu Railway are analyzed and the strengthening treatment of water gushing and collapsing is discussed together with some experience.
Keywords:tunnel construction  analysis of fault belt water gushing  strengthening treatment
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号