首页 | 本学科首页   官方微博 | 高级检索  
     检索      

广州港配套锚地建设滞后隐患和海事管理对策
引用本文:范文峰,杨林.广州港配套锚地建设滞后隐患和海事管理对策[J].中国海事,2013(2):33-35.
作者姓名:范文峰  杨林
作者单位:广州海事局,广东广州510700
摘    要:文中旨在介绍广州港区锚地的基本情况及存在的隐患,并结合锚地现状提出海事安全管理的建议,以期推动广州港配套锚地的建设,有效地预防水上交通事故发生。

关 键 词:锚地  滞后  隐患  对策

The potentioal risk of lag in anchorage construction in Guangzhou Port and the relevant maritime control measures to take
FAN Wen-fang,YANG Lin.The potentioal risk of lag in anchorage construction in Guangzhou Port and the relevant maritime control measures to take[J].Maritime Safety,2013(2):33-35.
Authors:FAN Wen-fang  YANG Lin
Institution:(Gzmangzhou MSA, Guangdong 510700 china)
Abstract:The purpose of this article is to introduce the basic intimnatioll concerning the anchorage capacity in the Guaugzhou Port and the potential risks existed, and to put forward some suggestions on maritime safety control, with a view to promotiingg the construction of supporting anchorages in the Guangzhou Port and etfectively preventing maritime accidents.
Keywords:Anchorage  lag  potential risk  measures
本文献已被 CNKI 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号