水泥稳定级配碎石基层在施工过程中的质量控制 |
| |
引用本文: | 金秀艳,金国栋,王曦东.水泥稳定级配碎石基层在施工过程中的质量控制[J].内蒙古公路与运输,2008(1):65-67. |
| |
作者姓名: | 金秀艳 金国栋 王曦东 |
| |
作者单位: | 锡林郭勒盟交通科学研究所,内蒙古,锡林浩特,026000 |
| |
摘 要: | 以内蒙古锡林浩特-桑根达来207线一级公路为例,对水泥稳定级配碎石基层材料的组成、配合比设计、施工工艺、质量控制等方面进行了阐述。
|
关 键 词: | 水泥稳定级配碎石基层 施工 质量控制 |
Quality control in the construction process of base course |
| |
Abstract: | According to the case of Xilinhot to Shorgandalai Section, the Class I Highway of the National Trunk Highway No. 207, this article describes the composition of materials for the cement - stabilized gravel base course, the mix design, the construction technology, and the quality control. |
| |
Keywords: | cement- stabilized gravel base course construction quality control |
本文献已被 维普 万方数据 等数据库收录! |
|