国道319重庆山洞段公路水毁处治研究 |
| |
引用本文: | 王庆珍,许仁安,凌建明.国道319重庆山洞段公路水毁处治研究[J].重庆交通大学学报(自然科学版),2005,24(2):66-72. |
| |
作者姓名: | 王庆珍 许仁安 凌建明 |
| |
作者单位: | 重庆市公路局,重庆,400067;同济大学,上海,200092 |
| |
摘 要: | 通过国道319水毁路段的治理工程,研究回填新路基与原有老路基结合隐患的不同处治技术,并通过后期路基沉降、支挡结构背后土压力、水平位移的监测数据分析,比较不同处治技术的效果,为类似工程提供技术经验.
|
关 键 词: | 水毁处治 新老路基结合部隐患 监测分析 |
文章编号: | 1001-716X(2005)02-0066-07 |
修稿时间: | 2004年6月8日 |
Research on the flood damage treatment technique at Shandong section of Chongqing of national trunk highway No.319 |
| |
Abstract: | Based on the flood damage treatment engineering project at Shandong section of Chongqing of national trunk highway No.319, this paper studied different treatment techniques of new-old basement conjunction problem, observed and analysed their subsidence, soil pressure and horizontal movement, and compared their effect, in order to provide technical help for such project. |
| |
Keywords: | flood damage treatment technique new-old basement observation |
本文献已被 万方数据 等数据库收录! |
|