首页 | 本学科首页   官方微博 | 高级检索  
     检索      

新扬大桥主桥V型三角区施工关键技术
引用本文:蒋红卫,徐智.新扬大桥主桥V型三角区施工关键技术[J].现代交通技术,2011,8(6):49-52.
作者姓名:蒋红卫  徐智
作者单位:1. 无锡市公共工程建设中心.江苏无锡214031
2. 江苏省交通工程建设局,江苏南京,210004
摘    要:文章以无锡新扬大桥为工程背景,详细介绍了该桥长48m,最大梁高8mV形三角区部分的施工步骤、节段划分、临时支墩设置及最后三角区支架的拆除,可为类似工程提供参考。

关 键 词:桥梁工程  V形支撑  节段划分  施工技术

Key Technologies of V-shape Triangle Area of Xinyang Bridge
Jiang Hongwei,Xu Zhi.Key Technologies of V-shape Triangle Area of Xinyang Bridge[J].Modern Transportation Technology,2011,8(6):49-52.
Authors:Jiang Hongwei  Xu Zhi
Institution:(t.Wuxi Public Project Construction Center,Wuxi 214031 ,China; 2.Jiangsu Province Transportation Construction Bureau, Nanjing 210004, China )
Abstract:Taking Xinyang bridge as an engineering background, this paper introduces construction processes, segment dividing, temporary pier setting and triangle support demolition of V-shapo triangle area, which is 48 m long and 8 m high. The paper could be taken as reference to similar projects.
Keywords:bridge engineering  V-shape support  segment dividing  consturciton technology
本文献已被 CNKI 维普 万方数据 等数据库收录!
点击此处可从《现代交通技术》浏览原始摘要信息
点击此处可从《现代交通技术》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号