圆梁山隧道出口机械配套及供电
引用本文:朱英会.圆梁山隧道出口机械配套及供电[J].隧道建设,2006,26(6):84-86.
作者姓名:朱英会
作者单位:中铁隧道集团二处有限公司设备物资部,河北,燕郊,065201
摘    要: 介绍圆梁山隧道出口端各个施工阶段的施工方案及相应的机械设备配置。对洞内主要用电设备的用电功率进行了统计,在此基础上给出了电力配套方案,并对供电设备的布置情况进行说明。最后对机械配置的缺陷提出了改进建议。

关 键 词:隧道  机械  配套  施工  电力  布置
收稿时间:2006-06-15
修稿时间:2006-08-09

Machinery Matching and Power Supply Applied in Construction of Exit Portion of Yuanliangshan Tunnel
ZHU Ying-hui.Machinery Matching and Power Supply Applied in Construction of Exit Portion of Yuanliangshan Tunnel[J].Tunnel Construction,2006,26(6):84-86.
Authors:ZHU Ying-hui
Institution:The 2nd Engineering Co. , Ltd. of China Railway Tunnel Group, Yanjiao 065201, Hebei, China
Abstract:The paper presents the construction methods and corresponding machinery matching schemes adopted in each construction stage of exit portion of Yuanliangshan tunnel. On basis of summary of the power capacity of the major electric equipment inside the tunnel, the paper describes the electric matching scheme and the arrangement of the power supply equipment. Finally, ng the defects in the matching of the machinery and equipment, the paper provides some modification recommendations.
Keywords:tunnel  machinery and equipment  matching  construction  electric power  arrangement