首页 | 本学科首页   官方微博 | 高级检索  
     检索      

高速公路土石混填路堤现场压实试验研究
引用本文:胡其志,袁海峰,潘诚文,徐学文.高速公路土石混填路堤现场压实试验研究[J].中南公路工程,2014(2):45-48,53.
作者姓名:胡其志  袁海峰  潘诚文  徐学文
作者单位:[1] 湖北工业大学,湖北 武汉430068 [2] 湖北省路桥集团有限公司,湖北 武汉430056
基金项目:湖北省教育厅重点项目(D20111406)
摘    要:结合某高速公路工程,对土石混填路堤展开现场压实试验,研究在不同碾压遍数和不同填铺厚度下土石混填路堤的竖向沉降、水平位移、基底竖向应力等的变化规律。结果认为:路堤的累积沉降量随碾压遍数的增加表现出先呈快速增长后逐渐稳定的特征,并且在相同铺填厚度下的差异沉降量随碾压遍数的增加而逐渐减小;水平位移和基底竖向应力也表现出与累积沉降量相似的变化规律,但水平位移量明显比沉降量小很多。通过对试验结果的分析,获得了最佳松铺厚度、碾压遍数等压实工艺参数,为该高速公路路堤施工提供了合理的指导。

关 键 词:土石混填路堤  现场试验  现场监测  压实质量

Study on Field Compaction Test of Expressway Embankment Filled With Earth-Rock Mixtures
HU Qizhi,YUAN Haifeng,PAN Chengwen,XU Xuewen.Study on Field Compaction Test of Expressway Embankment Filled With Earth-Rock Mixtures[J].Central South Highway Engineering,2014(2):45-48,53.
Authors:HU Qizhi  YUAN Haifeng  PAN Chengwen  XU Xuewen
Institution:1. Hubei University of Technology, Wuhan, Hubei 430068, China; 2. Hubei Road & Bridge Con- struction Group Corporation, Wuhan, Hubei 430056, China)
Abstract:Based on a expressway engineering,carry out a field compaction test to the embankment filled with earth-rock mixtures,research the variation about the vertical settlement,the horizontal displace-ment,the basal vertical stress,and the degree of compaction under the different compactions times and different paved thickness.The results indicate that with the increase of compactions times,the cumulative settlement of the embankment show a rapid growth in first and then gradually stabilized characteristics, and under the same paved thickness,the difference settlement decrease gradually with the increase of compaction times ;The horizontal displacement and basal vertical stress also show the same change rule as the cumulative settlement,but the horizontal displacement is obviously much smaller than the settle-ment.According to the analysis of the test results,obtained the compaction parameters,such as best fill-ing thickness,compaction times and so on.The parameters provides a reasonable guide to the construc-tion for the highway embankment.
Keywords:embankment filled with earth-rock mixtures  field test  field monitoring  compaction quality
本文献已被 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号