自行设计下导梁跨越电气化铁路运营线进行架梁施工
引用本文:李春廷,王云帆. 自行设计下导梁跨越电气化铁路运营线进行架梁施工[J]. 北方交通, 2008, 0(11)
作者姓名:李春廷  王云帆
作者单位:沈阳地铁有限公司,沈阳,110011
摘    要:介绍在海城站内跨越13股铁道线路进行架梁,其中有5条高压电化网已经通电运营。在两侧引桥未形成的条件下,自行研制提梁门架和下导梁,成功架设了30mT型梁和40m T型梁的施工过程。

关 键 词:电化网  下导梁  门架  架梁

Construction of Spanning Electrified Railroad Running Line to Erect Beam with Low Pilot Girder Designed by Oneself
LI Chun-ting and others. Construction of Spanning Electrified Railroad Running Line to Erect Beam with Low Pilot Girder Designed by Oneself[J]. , 2008, 0(11)
Authors:LI Chun-ting and others
Affiliation:LI Chun-ting and others
Abstract:The paper introduces the spanning the 13 railroads to erect the beam in Haicheng,among them 5 high-voltage fences already have been running.It still introduces the process that 30m T-type beam and 40m T-type beam have been successfully erected using the portal and low pilot girder developed by oneself under the conditions of the approaches at both side haven't formed yet.
Keywords:Fence  Low pilot girder  Portal  Beam erecting