竖井横通道转正洞施工方案比选
引用本文:李静.竖井横通道转正洞施工方案比选[J].隧道建设,2008,28(4):476-478.
作者姓名:李静
作者单位:中国中铁四局集团有限公司
摘    要:针对城市地铁竖井横通道转正洞施工难度大、工序繁杂的特点,通过方案比选,提出竖井横通道转正洞采用大包施工工法。该工程现已顺利竣工,工程实践表明,大包法施工安全可靠,技术经济和社会效益显著,可供类似工程参考。

关 键 词:城市地铁竖井横通道转正洞大包法
收稿时间:2008-03-25
修稿时间:2008-05-16

Comparison of Construction Schemes for Conversion from Horizontal Adit Driving to Main Tunnel Driving
LI Jing.Comparison of Construction Schemes for Conversion from Horizontal Adit Driving to Main Tunnel Driving[J].Tunnel Construction,2008,28(4):476-478.
Authors:LI Jing
Institution:China Railway No. 4 Engineering Group Co., Ltd.
Abstract:The conversion from horizontal adit driving to main tunnel driving of Metro works has great construction difficulties and complex construction procedures.It is proposed,on basis of construction scheme comparison,that full-envelope construction method should be adopted for the conversion from horizontal adit driving to main tunnel driving.The works has already been successfully completed.The works practice demonstrates that full-envelope construction method can provide safe and reliable construction and sign...
Keywords:Metro  vertical shaft  conversion from horizontal adit driving to main tunnel driving  full-envelope construction method  