首页 | 本学科首页   官方微博 | 高级检索  
     检索      

大跨浅埋公路隧道CRD法施工围岩松动圈量测与分析
引用本文:邵学富,朱菊辉,童立元.大跨浅埋公路隧道CRD法施工围岩松动圈量测与分析[J].交通标准化,2008(1):26-29.
作者姓名:邵学富  朱菊辉  童立元
作者单位:1. 江苏省高速公路建设指挥部,江苏,南京,210004
2. 东南大学交通学院地下系,江苏,南京,210096
摘    要:新奥法原理指导下的CRD分部开挖技术是目前大跨浅埋公路隧道施工的主要方法。鉴于大跨浅埋隧道不同施工工艺下围岩扰动影响差异较大,以宁常高速茅山隧道为例,采用多点电测锚杆和多点位移计对CRD法施工过程的围岩深层扰动区位移及应力进行监测与分析,得出围岩分步开挖的松动过程及松动圈主要分布特点,同时对锚杆设计支护深度的合理性进行验证,可为优化设计及指导施工提供技术根据。

关 键 词:大跨  浅埋  CRD法  松动圈  隧道
文章编号:1002-4786(2008)01-0026-03
收稿时间:2007-07-25
修稿时间:2007年7月25日

Test and Analysis on Loosing Zone of Surrounding Rock of Big-span Shallow Overburden Tunnel Constructed by CRD Method
SHAO Xue-fu,ZHU Ju-hui,TONG Li-yuan.Test and Analysis on Loosing Zone of Surrounding Rock of Big-span Shallow Overburden Tunnel Constructed by CRD Method[J].Communications Standardization,2008(1):26-29.
Authors:SHAO Xue-fu  ZHU Ju-hui  TONG Li-yuan
Institution:SHAO Xue-fu, ZHU Ju-hui, TONG Li-yuan (1.The Expressway Construction Headquarters of Jiangsu Province, Nanjing 210004, China; 2. The Department of Underground Engineering, Transportation College, Southeast University, Nanjing 210096, China)
Abstract:Based on the principle of New Austria Tunneling Method, the Cross Diaphragm Method is usually selected to construct big-span shallow overburden highway tunnel. Considering the difference of surrounding rock disturbing range of different construction scheme, the Mao Mountain Tunnel located on the Ning-Chang highway, was studied as an example. The deformation and stress of surrounding rock were monitored by using four-point electric monitoring rock bolts and displacement gauges when constructing with CRD method. The loosing process and distribution properties of loosing zone were analyzed. The results showed that the length of the rock bolts was reasonable and can be taken as references for the optimizing of design and construction schemes.
Keywords:big-span  shallow overburden  CRD method  loosing zone  tunnel
本文献已被 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号