摘    要:北京地铁10号线10标段折返线隧道二衬采用特殊支架法施工。介绍了纵分段、横分层、借梁换柱;散支散拼、隔段跳做;先二衬、后破除的施工方案,以及在工程实施中对施工节段长度、中隔壁凿除顺序、施工模架体系及组织运输等的合理选择,确保二衬施工安全、进度、质量及成本控制均达到预期目标。

关 键 词:地铁  折返线  隧道衬砌  支架法  施工技术

A Special Support Technique for the Construction of Subway Turn-back Line Tunnel
Chen Jiazhong.A Special Support Technique for the Construction of Subway Turn-back Line Tunnel[J].Urban Mass Transit,2008,11(7).
Authors:Chen Jiazhong
Abstract:A special support technique of the secondary lining is adopted for the construction of the turn-back line tunnel in the 10# contract of Beijing Subway Line 10.This paper introduces briefly the length of construction segment,the sequences of center dissepiment excavating,the frame system and transport organization,argues that a reasonable selection could ensure the safety construction,the scheduled progress,the quality and cost control,expects to achieve the expectative objectives.
Keywords:subway  turn-back line  tunnel lining  support technique  construction
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号