建设单位在工程量清单计价模式下的工程造价控制
引用本文:李树宽.建设单位在工程量清单计价模式下的工程造价控制[J].北方交通,2008(11).
作者姓名:李树宽
作者单位:辽宁省交通科学研究院,沈阳,110015
摘    要:根据工程量清单计价模式的特点,建设单位应从三个阶段采取相应措施加强工程造价的控制:在招标投标阶段,编制完善的招标文件和准确的工程量清单,评审投标报价的合理性,进而确定合同价的计价方式;在工程施工实施阶段,严格合同管理和工程变更签证管理;在工程竣工结算阶段,严格按合同和签证审核竣工结算,从而强化对工程造价的控制。

关 键 词:工程量清单计价模式  建设单位  工程造价控制

Engineering Cost Control by Building Unite under Mode of Quotation for Bill of Engineering Quantities
Authors:LI Shu-kuan
Institution:LI Shu-kuan and others
Abstract:In accordance with features of mode of quotation for bill of engineering quantities,the building unite should take appropriate measures to strengthen control of engineering cost from 3 stages-at stage of tender and bid,to draw up the perfect tender file and exact bill for engineering quantities,to assess and examine the rationality of bid quotation and to determine the charging way of contract;at stage of engineering construction and implementation,to manage strictly the contract and the visa of engineering change;at stage of final estimate after completion of engineering,strictly to examine and verify the final estimate according to contract and visa and to strengthen the control of engineering cost.
Keywords:Mode of quotation for bill of engineering quantities  Building unite  Engineering cost control