现浇预应力砼连续箱梁施工方法探讨
引用本文:吕芳. 现浇预应力砼连续箱梁施工方法探讨[J]. 交通标准化, 2007, 0(9): 104-106
作者姓名:吕芳
作者单位:河南路桥建设集团有限公司,河南,商丘,476000
摘    要:结合太原至澳门国家重点公路太原至长治段高速公路多座支架现浇预应力砼连续箱梁的施工实践,根据实际施工情况,对现浇预应力砼连续箱梁的施工过程及控制要点作一介绍,有利于该技术的推广应用.

关 键 词:支架  现浇  预应力  连续箱梁  施工控制
文章编号:1002-4786(2007)09-0104-03
收稿时间:2006-12-29
修稿时间:2006-12-29

Construction Method of Cast-in-place Prestress Concrete Continuous Box Girder
LV Fang. Construction Method of Cast-in-place Prestress Concrete Continuous Box Girder[J]. Communications Standardization, 2007, 0(9): 104-106
Authors:LV Fang
Affiliation:Henan Highway and Bridge Construction Group Co., Ltd., Shangqiu 476000, China
Abstract:Combining construction practice of many brackets cast-in-place pre-stress concrete continuous box girder in the section of Taiyuan to Changzhi of Taiyuan to Macao national key highway, and based on the actual construction condition, it is good for popularization to introduce the construction process and control key points of pre-stress concrete continuous box girder.
Keywords:bracket   cast-in-place   pre-stress   continuous box girder   construction control