首页 | 本学科首页   官方微博 | 高级检索  
     检索      

沈阳地铁盾构隧道设计浅谈
引用本文:王瑞峰.沈阳地铁盾构隧道设计浅谈[J].北方交通,2011(1):53-56.
作者姓名:王瑞峰
作者单位:辽宁省交通规划设计院,沈阳,110166
摘    要:在沈阳已建成的地铁一号线和正在建设的地铁二号线工程中,盾构法施工的隧道里程占总里程的60%以上,其高效性、安全性、经济性在沈阳地铁建设中得到了较好的体现。总结了沈阳地铁盾构隧道设计的成功经验,针对盾构法隧道管片设计、管片拼装、曲线段管片排版与线路拟合等关键问题提出了合理的设计方法与理念,对今后沈阳地铁的类似工程有一定指导意义。

关 键 词:地铁隧道  盾构法  管片设计  管片排版

Brief Discussion on Shield Tunnel Design of Shenyang Subway
Authors:WANG Rui-feng
Institution:WANG Rui-feng
Abstract:There is over 60% of the total length of tunnel constructed by shield method in the projects of the Line 1 and Line 2 of Shenyang Subway.Its high efficiency,safety and economy are well represented in the construction project of Shenyang Subway.Reasonable design method and concept to key problems such as segment design,segment assembly,segment arrangement in curve section and route fitting are proposed by summarizing the successful experience of shield tunnel design in Shenyang Subway,which may provide refer...
Keywords:Subway tunnel  Shield method  Segment design  Segment arrangement  
本文献已被 CNKI 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号