丹通高速公路溶洞发育区桩基施工技术 |
| |
引用本文: | 时涛.丹通高速公路溶洞发育区桩基施工技术[J].北方交通,2011(2):58-60. |
| |
作者姓名: | 时涛 |
| |
作者单位: | 辽宁省高速公路管理局,沈阳,110000 |
| |
摘 要: | 丹通高速公路第九合同段桩基数量482根,其中有344根处于溶洞发育区,经过7个月的时间这些桩基已基本全部处理完成。结合这些桩基溶洞处理经验,提出一些溶洞处理的方法。
|
关 键 词: | 高速公路 溶洞发育区 桩基 施工技术 |
Pile Foundation Construction Technology in Karst Cave Development Zone of Dantong Expressway |
| |
Authors: | SHI Tao |
| |
Abstract: | There are 482 piles in No.9 contract section of Dantong Expressway,therein 344 piles which cost 7 months to be treated located in karst cave development zone.Treatment methods for karst caves are proposed combining with the experience of treating karst caves in Dantong Expressway pile foundations. |
| |
Keywords: | Expressway Karst cave development zone Pile foundation Construction technology |