首页 | 本学科首页   官方微博 | 高级检索  
     检索      

陕北冻土高水位流沙地段管沟开挖方法研究
引用本文:李国明,王孟辉,冉国锋,孟江.陕北冻土高水位流沙地段管沟开挖方法研究[J].管道技术与设备,2012(1):44-46.
作者姓名:李国明  王孟辉  冉国锋  孟江
作者单位:1. 中国石油长庆油田公司建设工程处,陕西西安,710201
2. 中国石油天然气股份有限公司管道北京输油气分公司,北京,102400
3. 重庆科技学院,重庆,401331
摘    要:高水位流沙地段的管沟开挖一直是施工过程中的难点,虽然目前可采用深井抽排降水法、密闭管抽水降水法、明渠抽排降水法、木桩固定沟壁加抽水降水法等方法,但施工工序繁琐,成本高。文中提出应用冻土原理,在一次双侧沉管的基础上,采用二次双侧开挖新方法,将地下高水位的挖沟不利条件变为有利条件,降低了土方开挖量,取消了抽排水措施,提高了施工工效,节约了施工成本。该方法在陕京三线设计1标段榆阳马家峁段AA001-AA005高水位流沙地段工程施工中取得了良好的施工工效与经济效益。

关 键 词:冻土  高水位流沙段  一次双侧沉管  二次双侧沉管  管沟

Research on the Method for Trench Excavation of Frozen Soil and High Water Level and Quicksand Section in Northern Shaanxi
LI Guo-ming , WANG Meng-hui , RAN Guo-feng , MENG Jiang.Research on the Method for Trench Excavation of Frozen Soil and High Water Level and Quicksand Section in Northern Shaanxi[J].Pipeline Technique and Equipment,2012(1):44-46.
Authors:LI Guo-ming  WANG Meng-hui  RAN Guo-feng  MENG Jiang
Institution:1.Construction Engineering Department,PetroChina Changqing Oilfield Company,Xi'an 710201,China;2.China National Petroleum Corporation Pipeline Beijing Oil and Gas Transport Branch,Beijing 102400,China;3.Chongqing University of Science & Technology,Chongqing 401331,China)
Abstract:The pipe drain excavation is a difficult problem during the construction process in a high-water level and quicksand section.Though in a high-water level and quicksand section,trench excavation methods include the deep well pumping method,the sealed tube pumping,the open channel drainage precipitation method,the stakes fixed groove precipitation method and the plus pumping wall method.Thus the construction process is complicated and costs are high.By applying the principle of frozen soil,based on bilateral immersion,the new method of secondary sides digging is used.The method can change adversity of the underground water level into favorable conditions,reducing the amount of earth excavation,canceling the drainage and pumping measures,improving the construction efficiency,and also saving construction costs during the trench excavation.The method has achieved a good construction efficiency and economic result in the construction of the high water level and quicksand section in the Yangma hilly area of AA001-AA005 on the third Shaanxi-Beiing pipeline designed as Section 1.
Keywords:frozen soil  high water level quicksand section  first bilateral sink pipe  secondary bilateral sink pipe  trench
本文献已被 CNKI 维普 万方数据 等数据库收录!