首页 | 本学科首页   官方微博 | 高级检索  
     检索      

预应力混凝土斜拉桥调索设计新方法
引用本文:张鹏.预应力混凝土斜拉桥调索设计新方法[J].城市道桥与防洪,2020(4):68-71,I0006.
作者姓名:张鹏
作者单位:;1.北京建达道桥咨询有限公司
摘    要:综合分析了当前各主要调索方法的流程及利弊后,指出了分阶段施工的悬臂浇筑预应力混凝土斜拉桥内力状态无法逼近一次合理成桥状态,进而提出预应力混凝土悬臂浇筑斜拉桥可不进行合理成桥状态分析,直接考虑施工阶段进行正装调索设计的新理念。

关 键 词:预应力混凝土斜拉桥  调索  正装迭代综合法

New Methods for Cable Adjustment Design of Prestressed Concrete Cable-stayed Bridge
ZHANG Peng.New Methods for Cable Adjustment Design of Prestressed Concrete Cable-stayed Bridge[J].Urban Roads Bridges & Flood Control,2020(4):68-71,I0006.
Authors:ZHANG Peng
Abstract:By comprehensively analyzing the current processes,advantages and disadvantages of the main cable adjustment methods,it is pointed out that the internal force state of the cantilever cast prestressed concrete cable-stayed bridge cannot be approached to the state of a reasonably bridge formation in a staged construction.And then it is not necessary to carry out the state analysis of a reasonable bridge formation for the prestresssed concrete cantilever cast cable-stayed bridge.The new concept of directly formal cable adjustment design in the construction stage is considered.
Keywords:prestressed concrete cable-stayed bridge  cable adjustment  formal iterative synthesis
本文献已被 CNKI 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号