主跨218 m三塔自锚式悬索桥体系转换方案
引用本文:王健.主跨218 m三塔自锚式悬索桥体系转换方案[J].城市道桥与防洪,2020(4):112-114,I0010.
作者姓名:王健
作者单位:;1.上海绿地建设(集团)有限公司
摘    要:银川滨河黄河大桥主桥采用三塔双索面组合梁自锚式悬索桥,跨径布置为(88+218+218+88)m。为安全、高效地实现体系转换,需要选择合理的吊索张拉方案。综合考虑施工过程中各控制因素,对此三塔自锚式悬索桥吊索张拉方案进行研究。经计算分析,所选体系转换方案满足施工过程中各工序的技术标准。

关 键 词:自锚式悬索桥  三塔  体系转换  吊索张拉

System Transition Scheme of Three-pylon Self-anchorage Suspension Bridge with Main Span 218 m
WANG Jian.System Transition Scheme of Three-pylon Self-anchorage Suspension Bridge with Main Span 218 m[J].Urban Roads Bridges & Flood Control,2020(4):112-114,I0010.
Authors:WANG Jian
Abstract:The main bridge of Yinchuan Binhe Huanghe River Bridge is a three-pylon double-plane composite girder self-anchorage suspension bridge.Its span layout is 88 m+218 m+218 m+88 m.In order to safely and efficiently realize the system transition,it is required to select the reasonable suspender tension scheme.Various control factors should be comprehensively considered in the construction process.Therefore,the suspender tension scheme of three-pylon self-anchorage suspension bridge is studied.By calculation and analysis,the selected system transition scheme can meet the technical standards of various construction procedures in the construction process.
Keywords:self-anchorage suspension bridge  three-pylon  system transition  suspender tension