首页 | 本学科首页   官方微博 | 高级检索  
     检索      

泰州长江公路大桥钢塔柱吊装施工
引用本文:戴书学.泰州长江公路大桥钢塔柱吊装施工[J].中国港湾建设,2011(2):51-54.
作者姓名:戴书学
作者单位:中交二航局第二工程有限公司,重庆,400042
摘    要:结合泰州大桥中塔钢塔柱吊装施工实践,介绍了世界最高的纵向人字形、横向门式框架钢塔柱吊装施工工艺和监控方法。监测结果显示,施工满足设计和验收标准要求。

关 键 词:钢塔柱  吊装施工工艺  施工监控

Hoisting Construction for Steel Pillar of Taizhou Yangtze River Highway Bridge
DAI Shu-xue.Hoisting Construction for Steel Pillar of Taizhou Yangtze River Highway Bridge[J].China Harbour Engineering,2011(2):51-54.
Authors:DAI Shu-xue
Institution:DAI Shu-xue(The Second Engineering Co.,Ltd.of CCCC Second Harbor Engineering Co.,Ltd.,Chongqing 400042,China)
Abstract:Combining the hoisting construction practice of steel pillar in the middle pillar of Taizhou bridge,this paper introduces the hoisting construction technology of steel pillar,which is the world's highest transverse and longitudinal herringbone portal frame,and also introduces its monitoring method.It meets the design and the acceptance standard requirements after construction by monitoring.
Keywords:steel pillar  hoisting construction craft  construction supervision  
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号