开孔沉箱盖板顶托力现场观测与分析
引用本文:姜云鹏,邱田金,刘海源,张宝华.开孔沉箱盖板顶托力现场观测与分析[J].水运工程,2018(10):53-57.
作者姓名:姜云鹏  邱田金  刘海源  张宝华
作者单位:交通运输部天津水运工程科学研究所港口水工建筑技术国家工程实验室工程泥沙交通行业重点实验室;日照港集团有限公司
基金项目:国家自然科学基金项目(51409135);交通运输部建设科技项目(2013328224070);天津市应用基础与前沿技术研究计划项目(15JCQNJC07300);天津市科技服务业科技重大专项(16ZXFWGX00050)
摘    要:针对某工程开孔沉箱消浪室盖板顶托力问题,采用现场观测研究手段,对顶托力与潮位进行观测,总结潮位和顶托力分布特点,分析顶托力在单日、短时长和整个观测期间的规律以及顶托力过程和历时,对比盖板抬高0. 5 m后顶托力变化。结果表明:顶托力增长过程与潮位升高过程一致,盖板受力为潮位静水压力和波浪动水压力共同作用的结果,不同仓之间的受力表现为后仓中仓前仓,若盖板抬高0. 5 m,盖板受力状态将得到明显改善,沉箱盖板底高程对顶托力起着决定作用。

关 键 词:开孔沉箱  顶托力  现场观测  盖板

Field observation and analysis on wave uplift load of cover plate in perforated caisson
JIANG Yun-peng,QIU Tian-jin,LIU Hai-yuan and ZHANG Bao-hua.Field observation and analysis on wave uplift load of cover plate in perforated caisson[J].Port & Waterway Engineering,2018(10):53-57.
Authors:JIANG Yun-peng  QIU Tian-jin  LIU Hai-yuan and ZHANG Bao-hua
Institution:Tianjin Research Institute for Water Transport Engineering,National Engineering Laboratory for Port Hydraulic Construction Technology,Key Laboratory of Engineering Sediment,Ministry of Transport,Tianjin 300456,China,Rizhao Port Group Co.,Ltd.,Rizhao 276826,China,Tianjin Research Institute for Water Transport Engineering,National Engineering Laboratory for Port Hydraulic Construction Technology,Key Laboratory of Engineering Sediment,Ministry of Transport,Tianjin 300456,China and Tianjin Research Institute for Water Transport Engineering,National Engineering Laboratory for Port Hydraulic Construction Technology,Key Laboratory of Engineering Sediment,Ministry of Transport,Tianjin 300456,China
Abstract:Field observation is carried out to measure the wave uplift load of cover plate in perforated caisson.The processes of tidal level and uplift load are analyzed by a single day,a short period and the whole period,including the load process and time duration.The statistical result of load process and time duration of elevation up by 0.5 m is compared with the original elevation.It can be found that the rising process of uplift load grows in step with the tidal level.The uplift load is induced together by the tidal level and wave action.The load order for different bins from large to small is the back,middle and front.The uplift load would be obviously improved if the elevation of cover plate is raised by 0.5 m.The elevation plays a decisive role on the state of uplift load for cover plate in perforated caisson.
Keywords:perforated caisson  uplift load  field observation  cover plate